Barracuda provided all the underwater works for BAM International at Aqaba Container Terminal: Barracuda provided all underwater works for BAM International at Aqaba Container Terminal, including Steel Jacket installation, Clutch repair work, Welding piles underwater, Installation of Tie Rods, Cutting piles underwater 33 mm thickness, Anchor rods installation inside piles, Underwater inspections and reporting, (including CCTV, Video & photos), Lifting heavy objects from the sea, Dredging work underwater, Clearing debris from the seabed, Installation and removal of silt curtains